An existing skimmer pool can sometimes be converted to overflow, but the work is a major renovation rather than a new grate fitted around the old shell. The feasibility decision depends on finished water level, pool-shell condition, terrace levels, a continuous collection route, balance-tank and plant space, revised hydraulics, drainage, waterproofing and the approvals applicable to the property. Compare conversion with retaining and properly renewing the skimmer system before selecting a route.
Treat the change as a system conversion
A skimmer pool and an overflow pool manage the surface water in different ways. Skimmers draw water through openings in the wall below the coping. A deck-level overflow arrangement lets water cross a level edge into a channel before it continues to surge storage and the treatment system. That difference affects the edge, water level, pipework, controls, plant and terrace together. The useful first question is therefore not whether a contractor can cut a channel, but whether the property can accommodate a complete and maintainable overflow system.
Write the desired outcome before discussing demolition. Is the priority a flush water line, surface collection, an infinity effect, replacement of damaged coping or a wider visual update? A partial spill edge and a four-sided deck-level overflow are not the same project. A clear brief may show that a carefully detailed skimmer renovation meets the real objective.
Record what exists before choosing the edge
Commission a measured survey of the pool, terrace and plant area. Record coping and terrace levels, pool dimensions, current operating water level, skimmer and return positions, visible cracks or movement, finishes, access routes, drains, nearby doors and thresholds, garden levels and available equipment space. Existing drawings are useful evidence but should be checked against the built property.
Controlled opening-up can identify shell build-up, pipe material and routing, waterproofing interfaces and the substrate below the coping. The plan should say who approves each opening, how the pool is made safe and how findings enter the design. Avoid pricing a full conversion from surface photographs alone.
Compare three realistic renovation routes
Put the alternatives on one page before fixing a preferred solution. The table is a briefing tool; the appointed designer must develop the property-specific structure and hydraulics.
Swipe or scroll horizontally to compare all columns.
| Route | What changes | Main checks |
|---|---|---|
| Renew the skimmer pool | Replace or reposition selected fittings, renew finishes and edge details while retaining wall-level surface draw | Skimmer quantity and location, pipe condition, water line, coping, returns, treatment and visual brief |
| Create a designed spill or infinity edge | One selected edge discharges to a collection detail while other edges remain contained | View direction, catchment and surge storage, wind exposure, lower-level drainage, structure and safe access |
| Convert to deck-level overflow | Rebuild the perimeter edge and collection channel, revise hydraulics and provide coordinated surge storage and controls | Level tolerance, channel continuity, tank and plant space, terrace falls, thresholds, waterproofing, movement joints and approvals |
Prove the proposed water level in sections
An overflow edge depends on a controlled relationship between the pool water line, channel lip, grate or slot, terrace finish and adjacent thresholds. Draw sections through every edge condition, including steps, corners and any change in terrace material. Show existing and proposed levels separately. A perspective image can communicate the look, but it cannot prove that water will reach the collection edge evenly or remain away from the villa.
The surrounding terrace may need more work than the pool interior. Falls should follow the coordinated drainage design while door thresholds remain protected. Movement joints, coping removal, tile module, channel access and replaceable grates should appear in the details. Confirm ownership of interfaces between pool, structure, waterproofing and landscape packages.
Allow for overflow hydraulics and surge storage
A conversion needs a route from the channel to storage and from storage through treatment and back to the pool. The current Fluidra SPACE PRO manual illustrates one manufacturer system in which an overflow pool uses a buffer tank, transfer arrangement and water-level controls, while its skimmer diagram uses a different surface-suction path. It is a useful demonstration of the system difference, not a universal design or an endorsement for this project.
Ask the appointed pool specialist to document design flow, turnover basis, channel collection, pipe sizes and routes, storage calculation, operating levels, make-up water, backwash and drainage connections, dry-run or overflow protection, access and control logic. AstralPool's dedicated overflow-channel suction component is another reminder that channel fittings are selected parts of a hydraulic system. Product references do not replace a coordinated design for the actual pool.
Find space that remains serviceable
A balance tank is not an anonymous box to hide wherever space remains. Its usable volume, access, cleaning, level sensors, make-up arrangement, overflow and drain need coordination. The pipe route should not trap inaccessible joints under high-value finishes.
Map the service route from terrace to plant area and note structural crossings, landscape roots, other utilities and future access panels. If the only suggested location compromises a room, emergency route or neighbour-facing boundary, reassess the hydraulic concept. A remote location may also affect levels and pipework, so it should be reviewed by the appointed specialists rather than assumed from plan distance alone.
Coordinate structure, waterproofing and finishes
Cutting or extending the pool edge can affect the existing shell and surrounding slab. The structural engineer should review survey and opening-up findings, the proposed channel support, any new tank, penetrations and movement interfaces. Do not let a tile or grate detail silently become the structural strategy. Record repair methods and hold points before work is concealed.
Waterproofing must form a continuous compatible system around the altered shell, channel, fittings and joints. Specify preparation, substrates, changes of plane, penetrations, curing, testing and protection. Identify tiles, grout, sealants, grates, coping and maintenance access after the build-up is proven.
Prepare approval-ready information
Dubai Municipality's current swimming-pool plan guideline, version 4.0 issued 4 May 2024, lists coordinated information including the site or setting-out plan, pool plan, cross-section, pipe and pump-room layout, electrical diagram, schematic drawing and drainage scheme. The pool plan is expected to show features such as stairs or ladders, lights, depth, surrounding fence, deck and slope, while the pump-room submission covers equipment and turnover details.
The authority path also depends on the property, community, free zone, alteration scope and appointed consultants. Confirm applicable approvals in writing before demolition, including community requirements where relevant. A claim that a renovation is minor is not an approval record.
Use this conversion decision checklist
Require the same evidence for the retain-skimmer and overflow options so cost and disruption are compared fairly.
- Define the visual and performance objective for changing the edge
- Complete a measured level survey of pool, terrace, thresholds and plant area
- Plan controlled opening-up and record the findings
- Issue existing and proposed pool sections through every edge condition
- Show channel continuity, collection points and cleaning access
- Provide the balance-tank basis, operating levels and access strategy
- Show pipe routes, treatment flow, make-up, backwash and drainage
- Coordinate structural review, penetrations and movement joints
- Specify a continuous waterproofing and testing sequence
- Resolve terrace falls, grates, tile modules and adjacent landscape
- Confirm property-specific approvals and drawing responsibilities
- Compare programme, exclusions, temporary works and reinstatement for every route
Ask for a priced, property-specific comparison
A useful proposal separates investigation, design, approvals, demolition, temporary works, structural alteration, waterproofing, finishes, hydraulic and electrical work, tanks, controls, drainage, testing, commissioning and reinstatement. It should identify assumptions and exclusions, including unknown shell or pipe conditions. Provisional allowances should have a clear basis and a process for approval before they change.
For a Veyrune pool-renovation discussion, provide survey drawings if available, photographs of every pool edge and the plant room, known defects, desired water-line appearance, community details, access constraints and the target use of the terrace. The next step is an evidence-led feasibility layout comparing a renewed skimmer pool with the relevant overflow alternative before a construction scope is fixed.
Frequently asked questions
01Can an overflow channel simply be added around the existing coping?
Usually not as a complete conversion. An overflow system needs coordinated collection, storage and circulation as well as compatible edge, terrace, structure, waterproofing and drainage details. A designer should first record the existing levels and construction, then develop sections showing the proposed water line, channel, pipe routes and balance-tank relationship.
02Does a skimmer-to-overflow conversion always need a balance tank?
A conventional deck-level overflow arrangement normally relies on surge storage and water-level control, but the selected hydraulic concept must be designed for the actual pool and equipment. Ask the pool designer to state the storage calculation, operating levels, controls, access and overflow route rather than accepting an unnamed tank allowance.
03Is conversion better than renovating the existing skimmer system?
Not automatically. Overflow may deliver the water-line appearance and surface collection a brief requires, while a renewed skimmer pool can avoid extensive edge, terrace and storage work. Compare both options against the same brief, condition findings, drawings, exclusions, programme and whole scope before deciding.
Sources and further reading
Dubai Municipality: Technical Guidelines for Approval of Swimming Pool Plans, Version 4 ↗Checked Monday, 2 November 2026Fluidra: SPACE PRO Installer and User Manual, January 2026 ↗Checked Monday, 2 November 2026AstralPool: Suction Nozzle — Overflow Channel ↗Checked Monday, 2 November 2026Confirm current requirements for your property and selected equipment. Product examples do not imply a supplier relationship or local availability.
This is an editorial planning guide, not a property survey, approved design or installation specification. Project requirements are confirmed by the appointed specialists.
Let’s bring it back to your home.
Explore the complete service and share a first brief for your property.
Major pool renovations in Dubai